Features:
Snow de-icing cable prevents winter damage to roof, gutters, and downspouts
Provides uninterrupted path for melting water to flow off roof
Suitable for most roof and gutter configurations
Available in several lengths(20-240ft)
Easy to install, no maintenance required
Accessory available: clips & spacers
3 -year warranty for whole heating cable system
Heatig Cable Specifications:
Cable Construction |
Twin conductor |
Rated Heating Voltage |
120 VAC |
Heating Output |
5 W/ft |
Heating Element Size |
20-240 ft |
Heating Conductor Insulation |
XLPE |
Outer Insulation |
PVC |
Min. Installation Temp. |
0°C |
Cold lead |
6ft length with plug |
Catalog Number |
Length |
Watt |
Current |
Feet |
Meter |
(W) |
(AMP) |
SHRD-20 |
20 |
6 |
100 |
0.8 |
SHRD-30 |
30 |
9 |
150 |
1.3 |
SHRD-60 |
60 |
18 |
300 |
2.5 |
SHRD-80 |
80 |
24 |
400 |
3.3 |
SHRD-100 |
100 |
31 |
500 |
4.2 |
SHRD-120 |
120 |
37 |
600 |
5 |
SHRD-160 |
160 |
49 |
800 |
6.7 |
SHRD-200 |
200 |
61 |
1000 |
8.3 |
SHRD-240 |
240 |
73 |
1200 |
10 |
Installation Notes
1) Don't damage cable. The bend radius should be more than 6 times of thickness of cable.
2) Well installation can guarantee the efficiency. Use nylon cable ties to fix heat cables.
3) Add an aluminum tape between the pipe and the heat cables if the Pipe is non-metallic.
4) After the installation, take a full test and make sure the system works well.
5) Heat insulation materials should be dry and the joint of cable should be sealed.
6) Make a mark on the outer protective layer of the pipe.
7) The junction box should be sealed to prevent rainwater.
8) For explosion-proof products, the metal jacket should connected to the terminal.
9) Protective sleeve must not be damaged during installation, and the core wire can not bare.